Fuselage (page 2)
October 12, 2008 5.5hrs - 339.5 total.  Marked and
cut notches in fence peices. Am going back through
and verifying the notch sizes and trimming to fit as
needed.
October 13, 2008 1.5hrs - 341.0 total. Finished
trimming all the fence piece notches to size. Cleared
off jig table and layed out side rails. Trail fit a
couple of the fences. Nice tight fit. Now I just need
to cut the elaborate holes and notches in each of the
fence peices!
October 14, 2008 1.0hrs - 342.0 total. Picked up
rails to move them out of the way to start working
on the fences and one of the rails broke in two at one
This photo is of the prototype during the
earlier phases of construction.
of the notch locations. Have glued and clamped it back together.  Will have to wait till it dries to see if its gong to work
or if I'll have to re-make the whole piece.
October 16, 2008 0.5hrs - 342.5 total. Removed clamps.  Looks like it might hold.  Will have to treat it very gently.
October 17, 2008 1.0hrs - 343.5 total. Cleaned up a little.  Studied plans and verified dimensions on fences, layout,
etc. Need to check newer version of plans for changes.
October 18, 2008 11.0hrs - 354.5 total.  Sat down to layout holes in fences and remembered that I hadn't gone through
and updated the plans since the new release a couple of months ago. Checked the new release CD on the PC and found
several significant changes. Figured out which ones were new and plotted out new drawings for them all..
October 19, 2008 6.5hrs - 361.0 total. Sorted through plans, inserted new and trashed old. Made a template for the
index hole that goes on all the fence pieces. Brought jig saw up from basement and set up to start cutting index holes.
Then decided instead to drill and form index with all of them in a stack. Moved drill press up out of basement.  Drilled
through stack.  Ground down a hack saw blade to fit into hole to cut index groove.
Rails laying on the jig table. Had to use 3/4" HDPB
as I couldn't get 1/2" longer than 8ft in town.
Fence pieces clamped
together
October 20 to 23, 2008 4.5hrs - 365.5 total. Finished cutting alingnment groove into fence pieces and noticed I did it
on the bottom rather than the top of all the pieces.  Checked the plans and it looks like it will be fine there.  Seperated
the fences and labeled with thier fence number. Rechecked all the center lines.  Started marking them for the needed
holes and cutouts. Have finished about 1/3 of them.
October 24 and 25, 2008 2.5hrs - 368.0 total. Marked up a few more fences.  Only have 3 or 4 left to mark.  Spent
about 8 hours putting insulation in the shop as its staying below zero outside most of the time now.
Marking the fence pieces carefully as they are critical
to the alignment of the fuselage bulkheads.