  • Builder's Log
  • More
    • Home
    • Current Progress
    • Dec 2024 to March 2025
    • Aug 2023 to Nov 2024
    • Sept 2022 to Aug 2023
    • May to September 2022
    • March to May 2022
    • Jan to Feb 2022
    • Nov 2021 to Jan 2022
    • Oct to Nov 2021
    • July to Sept 2021
    • Jan to July 2021
    • Builder's Log
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Current Progress
  • Dec 2024 to March 2025
  • Aug 2023 to Nov 2024
  • Sept 2022 to Aug 2023
  • May to September 2022
  • March to May 2022
  • Jan to Feb 2022
  • Nov 2021 to Jan 2022
  • Oct to Nov 2021
  • July to Sept 2021
  • Jan to July 2021
  • Builder's Log

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Builder's Log

This log is organized chronologically rather than by build section

Originally I had this broken down by structural section of the project, but it got too complex to follow.  Have gone back to the idea of just basically publishing the build log, in the order it was done.


The website navigation is a little clunky.  I apologize for the multiple pages for each year, but I couldn't find a way around it.

2007 - Page 1 - Start! Horizontal Stabilizer and Elevator

June 17th to December 13th - Started on the parts that would go in the horizontal stabilizer and elevator, and some other small parts.

2007 Page 1

2007 - Page 2

2008 - More Empennage and Bulkheads

December 26th to the 31st - Began assembly of horiz stabilizer

2007 Page 2

2008 - More Empennage and Bulkheads

2009 - Bulkheads, Longerons and Glue Cracks

2008 - More Empennage and Bulkheads

Glued up the insides of the horizontal stabilizer and elevator. Built the workbench and started cutting out the fuselage bulkheads.

2008 Log pages

2009 - Bulkheads, Longerons and Glue Cracks

2009 - Bulkheads, Longerons and Glue Cracks

2009 - Bulkheads, Longerons and Glue Cracks

Finished up all the bulkheads, hung in the jig, glued in the main longerons, and ran into the "glue cracking issue."

2009 log pages

2010 - Stringers, Diaphragms and Skin

2009 - Bulkheads, Longerons and Glue Cracks

2009 - Bulkheads, Longerons and Glue Cracks

Resolved the glue cracking issue, installed remaining longerons, stringers, diaphragms, solid bulkheads, and firewall.  Built rudder box, removed fuselage from jig and started on skin.

2010 log pages

2011 - Skin, Control Pulleys and Column

2011 - Skin, Control Pulleys and Column

2011 - Skin, Control Pulleys and Column

Installed much of the fuselage skin to the sides and over the top. Installed canopy rails, control column box and column. Installed rudder and elevator control cable pulleys. Installed elevator and horiz stab hinges and aligned. Stated skinning horiz stab.

2011 log pages

2012 - Elevator, Fin, Rudder

2011 - Skin, Control Pulleys and Column

2011 - Skin, Control Pulleys and Column

 Finished skin the horiz stab. Lots of work on getting the elevator  to fit and work right, and ready to cover. Made the rudder - twice. Mounted horiz stab permanently onto fuselage. Started on fin. 

2012 log pages

Builder's Log

2013 - Rudder, Fin, First Fiberglass Fairing

Finished rudder and hinges, skinned fin, added some more fuselage skin.  Made up first fiberglass fairing at front of fin to fuselage join.  Storage area cover and fin side panel covers.

2013 log pages

2014 - Tailwheel, Bottom Longeron

Tailwheel strut install took more than one try.  Bottom longeron was a problem and had to be completely removed and re-done.  Pilot seat back access panel.

2014 log pages

2015 - Rudder Trim, Belly Skin, Stab Fairings

Rudder trim motor, all of the belly skin.  Access ports and covers.  made up horiz stab fairings with "fairing mix". Tweaked rudder to fit.

Find out more

2016 - Control Weights, Mast, Final Skin, Door, Prime

2016 - Control Weights, Mast, Final Skin, Door, Prime

Rudder and elevator control balance weights. Antenna mast. Finished skinning fuselage, built cockpit door. Applied primer to fuselage and empennage.  Windscreen frame. Started on windscreen plexi.

Find out more

2017 - Windscreen, Frame, Instrument Panel, Tank Cover

2016 - Control Weights, Mast, Final Skin, Door, Prime

2017 - Windscreen, Frame, Instrument Panel, Tank Cover

Windscreen plexi and windscreen frame. Forward fuselage ribs. Started on instrument panel and "blind flying" panel.  Installed some instruments. Received throttle quadrant. Fuel tank cover and mounts.

Find out more

2018 - Rudder Tweak, Wing Ribs, Fuel Tank, Landing Gear

Rudder and elevator skin finish up.  More instruments and knobs for panel. Start on wing ribs. Purchased main gear (project). Made parts for fuel tank.

2019 - Tailwheel (again), Fuel Tank, Cockpit Parts, Engine!

New tailwheel and fork, more work on wing ribs, visit by Silver Spitfire, rudder pedal castings, elevator and rudder trim controls, gear retract lever, spade grip. Finished fuel tank. Purchased V8 engine!

2020 - Fuel Gauges, Received Engine, Built New Shop

2020 - Fuel Gauges, Received Engine, Built New Shop

Little progress on Spitfire as I had to build a shop big enough to continue working on the project. Ordered custom fuel indicators.  Received engine.