Bruce's Spitfire

Bruce's SpitfireBruce's SpitfireBruce's Spitfire

Bruce's Spitfire

Bruce's SpitfireBruce's SpitfireBruce's Spitfire
  • Home
  • For Sale - Info
  • Current Progress
  • Dec 2024 to March 2025
  • Aug 2023 to Nov 2024
  • Sept 2022 to Aug 2023
  • May to September 2022
  • March to May 2022
  • Jan to Feb 2022
  • Nov 2021 to Jan 2022
  • Oct to Nov 2021
  • July to Sept 2021
  • Jan to July 2021
  • Builder's Log
  • More
    • Home
    • For Sale - Info
    • Current Progress
    • Dec 2024 to March 2025
    • Aug 2023 to Nov 2024
    • Sept 2022 to Aug 2023
    • May to September 2022
    • March to May 2022
    • Jan to Feb 2022
    • Nov 2021 to Jan 2022
    • Oct to Nov 2021
    • July to Sept 2021
    • Jan to July 2021
    • Builder's Log
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • For Sale - Info
  • Current Progress
  • Dec 2024 to March 2025
  • Aug 2023 to Nov 2024
  • Sept 2022 to Aug 2023
  • May to September 2022
  • March to May 2022
  • Jan to Feb 2022
  • Nov 2021 to Jan 2022
  • Oct to Nov 2021
  • July to Sept 2021
  • Jan to July 2021
  • Builder's Log

Account

  • My Account
  • Sign out

  • Sign In
  • My Account

2008 - Page 3

  •  July 7th 6.5hrs - 276 total. Finished sanding flanges, ribs, and laminates to shape. Hand sanded all edges, turned tail over and sanded all edges on other side. Shaped laminates at point where elevator and stab edges line up.  Cut laminates and  separated elevator from stab. Clamped both pieces to table and started shaping the edges now that I can see both sides more clearly. Couldn't really do it very well with them laying flat. Started making blocking for hinge points on elevator. Found a point on elevator trailing edge that is sanded too much.  Need to glue some material in places and sand down to shape. 


  • July 13th, 2008 2.5hrs - 278.5 total. Finished making blocking for hinge attach points on elevator spar.
  • July 19th, 2008 6.0 hrs - 284.5 total.  Cleaned out elevator flange and spar web area where blocking will go, removing old dried glue. Glued in elevator hinge point blocking and small laminate piece on trailing edge of elevator where I got a little carried away with the belt sander. Went and bought a couple of 4 ft fluorescent lights and hung up over the work bench. Finished up sanding of stab leading edge.  Checked profile of ribs and sanded some down a bit to keep airfoil surface consistent across top and bottom surface of stab. Finished sanding trailing edge laminates on elevator except for patched areas - glue is still drying. Dry fit elev and stab end cap.  Stab are OK, but  elevator are too small.  Made new ones.  Marked all four for gluing. 

Port end of elevator from the bottom. Shows hinge point blocking glued in place and hardwood backing plate ready to be glued over it

 

Close up of finished elevator hinge point blocking and backing plate ready to be glued in

  • July 20th, 2008 3.5hrs - 288 total.  Removed clamps.  Sanded down elevator hinge point blocking.  Started making hardwood backing plates.  Sanded down repair to trailing edge laminate. Sanded to shape.
  • August 25th, 2008 2.5 - 290.5 total. Finished making hardwood backing plates for elevator. Ready to glue them on. Cleaned up shop. Vacuumed up huge amounts of sawdust.  Re-read instructions and plans.  Can't verify when in the sequence to put the end plates on the stab and elevator.  Written instructions say put them on now, but drawings say to wait?  Picked up a spray can of self etching primer for the metal parts.
  • September 4th, 2008 2.0 - 292.5 total.  Glued hardwood backing plates onto elevator attach points.  Moved the horiz stab into a storage area in the basement.  Will move the elevator there too, when the glue dries, the clamps are off, and I've sanded the backing plates to match the spar profile.  Started planning for the fuselage jig.  Am working on a method to attach it to the floor and still allow me to level it quite a bit.  The garage floor is very uneven. Am planning to attach a couple of sheets of strand board or plywood to the floor with concrete anchors or even liquid nails.  Then I could put the jig on the flooring and be able to screw down whatever shims or bracing I end up needing.   Its starting to get below freezing at night and I still just have an electric heater in the garage.  Will be plumbing in an area heater to the house boiler within the next few days.  Gotta keep those glues at a nice cozy working temperature!
  • September 5th, 2008 1.0 - 293.5 total.  Removed clamps, sanded down edges of backing plates to match flange profiles.  Moved elevator  and horiz stab into basement.  Cleared away working tables from garage to make room for fuselage jig.  
  • ***NOTE**** January 11 2010 - After talking to Terry and reviewing the plans have determined that I used the wrong type of wood for the filler and backing plates for the elevator, and the wrong wood for the backing plates on the horiz stab. I'll have to redo some of the finished work before I can move forward with these parts. When I back to working on the tail again - that is. 

????????????????????????????????????????????? ended editing

Stabilizer clamped to table and elevator clamped to stab with critical gap distance (1 15/16") maintained by three blocks and wingtip forms.  Note block at bottom of picture.  You can see the port trim tab hinge plates - this will be the operational tab.  The other will be fixed, but will be included for authenticity as the original Spitfire had tabs on both elevators.

Wingtip clamping block with loosely clamped edge laminate in place.

Edge laminate loosely clamped around wingtip contour.

  •  May 28th, 2008 3.0hrs - 219.0 total.  Removed strips from gluing clamps, sanded and cleaned up scarf joints.  Clamped one of the strips all the way around the stabilizer and elevator for dry fit.  Did final sanding on tips of ribs and spars to shape to contour.  Shortened the jack ribs by about 1/4" to get them to fit.  Drilled and temporarily tacked first laminate in place.  Cut to length.  Need to prep for gluing with wax paper then  should be ready to glue it on.  Its actually starting to look like part of an airplane!
  • May 30th, 2008 - 0 time - doesn't count for work on plane.  Bought a couple of  equipment stands, put them together and brought the band saw and belt/disc sander up from the basement into the garage.  Re-arranged a bunch of the clamps to try to free up enough for upcoming laminate gluing task.
  • May 31st, 2008 6.0hrs - 225.0 total.  Cut and formed all of the backing laminate pieces that go between the stabilizer ribs behind the first laminate.  Prepped for the glue job by covering anything that should be glued with wax paper or masking tape. Glued the first laminate all the way around then glued in all the backing laminate pieces.  Took three batches of glue - the largest glue job I've done yet! 

It takes a lot of clamps to keep the laminate layers tight around the curved profile.

Gluing the second layer of laminate to the back of the first between the ribs really locks the ribs in place.

Gluing on the 3rd laminate layer.  Most of the clamping blocks have been removed now

  •  June 1st 2008 1.5hrs - 226.5 total.  Removed clamps holding on backing laminate layer.  Removed all clamping blocks from stabilizer section except end blocks.  Sanded down external side of first laminate to prep for next layer.   Glued 3rd laminate strip all the way around on top of first.
  • June 11, 2008 2.0hrs - 228.5 total..  Have done a little work off and on over the last few days.  After the 3rd laminate layer dried, removed all the clamps.  Got out the elevator horn ribs and dry fit them in place.  Found that the drawings and full size template clearly show the parts - which I made exactly as shown, but the WRITTEN
    directions mention "be sure to add 1/4" on all sides" when you make these parts to allow them to be sanded to shape.   Sure enough they are too small and will have to be re-made.  Would have been nice if that was mentioned somewhere - ANYWHERE - on the plans!  Have spent quite a bit of time reading over the directions to be sure I clearly
    understand what's coming up next. 


  •  June 13, 2008 2.5hrs - 231.0 total.  Traced and rough cut new horn ribs and end plates.  Started measuring for positioning pieces into elevator and stabilizer assy.  Not an easy task!  Determined that I cut  the elevator 1/8 longer on the starboard side.  Also that positioning measurements on the plans are made with all of the laminates in place, but at this point in the assembly process the last four laminates haven't been installed yet.  Strapped some small pieces of laminate in place to simulate the extra size and remeasured.  Its starting to come together, but is very confusing and I want to be sure I get it right!
  • June 14, 2008 1.5hrs - 232.5 total.  Finalized position of elevator horn ribs and marked them.  Cut off the ends of the horiz stab rear spar to approximate length.   Dry fit new over sized horn ribs, cut and sanded to shape.  Had them fitting nicely when I realized I needed to allow an extra 1/16" for the end plates.  Got one of them adjusted, still  needed to do the other. Haven't cut the lightening holes in them yet either. 

Elevator horn rib clamped in place. 1/16" face plate is lying next to it. Elevator nose rib #1 is dry fit into the front of the spar to help in positioning the horn rib.

  •  June 15, 2008 5.5 hrs - 238 total.  Adjusted fit of second horn rib.  Cut lightening holes in both and hand sanded. Shaped outer edges a little closer to profile. Did  another dry fit and sanded both a little more for better fit. Made blocking pieces. Glued it all in place. 

Elevator horn backing plate glued in place with spruce blocking pieces installed.

  •  June 16th, 2008, 1.0hrs - 239.0 total.  Removed clamps from last nights gluing.  Made ip 7/16" spacers for stab back plate spacing.  Marked stab rear spar at points where backing plate needs to fit. Will need to make some small spruce blocking to fit between spar flanges at end of spar then  shape backing plates to fit before gluing them in.
  • June 17, 2008 .5hrs - 239.5 total.  Took some measurements for the blocking.  made a sample piece, turned out too small.   Decided I need to cut the spars first. Re-measured and marked end points of rear spar.  Cut off ends of port spar rough sanded down to shape.
  • June 18, 2008 2.0hrs - 241.5 total.  Finished cutting and sanding both ends of the trailing edge spars to shape.  Made spruce filler blocks for both ends.  Cut and sanded stab backing plates to fit.  Still need to cut lightening holes in them.
  • June 19, 2008 2.0hrs - 243.5 total.  Cut lightening holes in endplates and sanded by hand. 


  •  June 20, 2008 2.5hrs - 246 total.  Dry fit the endplates again.  Didn't like the fit
    of the blocking for the ends of the spars so re-made them. Made up blocking for
    backing plate behind leading edge. Preped surfaces and glued in place. 

Stab backing plate and blocking glued in place

  • June 21, 2008 4.5 hrs - 250.5 total. Removed clamps and temporary spacer. Cleaned up broken glue joints on two of the elevator ribs  where I popped the laminates off  accidentally.  Prepped them to be re-glued. Sanded #2 elevator rib trailing edge down a little to make it match the other side of the elevator, looks much better now. Cleaned up the outside of the existing laminates on the elevator, prepared for gluing. Couldn't find anywhere where it clearly stated how many layers were on the elevator. Called Terry and confirmed it was 2 more - total of 4 - creating a trailing edge piece 1/2" thick.  Prepared some laminate material.  Glued on the last two laminate layers on the  elevator and clamped in place.  Also re-glued the two popped glue joints mentioned above.
  • June 22, 2008 3.5 hrs - 254 total.  Removed clamps from laminates. Cleaned up glue joints at trailing edge of elevator all around to allow for tight fit of spruce blocking.  Started making blocking for elevator trailing edge. Dry fit the trim tab ribs.  Looks like a couple of them are too short and will have to be re-made. Am supposed to separate   the elevator from the stab at this point, but am going to leave them connected until all the sanding and shaping of the spars, blocking and laminates are complete. 

Elevator blocking dry fit on starboard side (assembly is upside down)

  • June 24, 2008 2.5hrs - 256.5 total.  Rough trimmed laminates on elevator starboard side top and bottom, and port side bottom, but broke glue joints at three ribs on port side so will wait till blocking is glued in before trimming the rest of the laminates.  Finished making all the blocking for the elevator that can be seen on my version of the plans.   Terry is sending a new copy with the plywood covering layer hidden so I can see what goes under there.  Will finish the blocking when I get that drawing. 


  •  June 25, 2008 3.5hrs - 260 total.  Got drawing and made missing elevator blocking pieces.  All the rest looked a little large. Rechecked and found them all a little over sized. Cut and sanded them all down to size and shape. Glued in all elevator blocking.  Used extra glue to go around and re-seal and touch up some areas with small gaps in the glue. Got bigger glue cups and put crushed ice in one with a little water then nest a second cup with the epoxy into the first.  Glue gets very cold and slightly thick which is easier to work with, and lasts for about an hour!  Before I would get as little as five minutes before it would start to bake off.  The longer work time allows me to slow down
    and do a much more thorough job of positioning, gluing and clamping the parts.
  • June 26, 2008 0.5hrs - 260.5 total.  Removed clamps from elevator blocking.  Started working on trim tab ribs.  Most are sanded too small and need to be re-made. 


  •  June 27, 2008 1.5hrs - 262 total. Re-made most of the trim tab ribs from scratch.   They are all ready now. Need to put laminate layer between ribs behind existing laminate to lock them in place the same as was done on the stab leading edge ribs. 

Trim tab ribs dry fit. This is the bottom of the starboard side

  •  June 28, 2008 2.0hrs - 264 total. Cut backing laminate pieces to shape.  Glued them in along with  all the ribs in both trim tabs.  Once these dry it will be time to trim all the laminates and sand everything to shape.
  • June 29, 2008 5.5hrs - 269.5 total, Removed clamps and started sanding. Soon
    discovered it was going to take forever so went and bought a hand held 3" belt sander.
    Finished sanding the bottom side of the entire stab and elevator structure. Unclamped
    from work table and was able to lift and turn over the assembly without any trouble
    by myself.  I could lift it easily with one hand.  Must weight about 25 to 35 lbs.   Clamped it back down to the table, trimmed off some more laminates with the jig saw then started sanding and shaping the top side.  Was getting tired and starting to make
    mistakes so decided to stop for the night. 

Elevator separated from stabilizer. Sanding laminates to shape